How much of the trail is paved?

Posted on 08. Feb, 2017 by in

A little over 12.5 miles is paved, mostly on old railroad beds, and using the connector streets of the trail.  It’s ~ 25 mile round trip ride from Oriental St to the end of the pavement in Camino at Halcon Rd.

Comments are closed.