- The county line to Latrobe is ~ 7 miles of dirt trail, traversing on the rail bed at bridges, cuts and fills.
- Latrobe to Shingle Springs is ~9 miles of dirt trail, traversing on the rail bed at bridges, cuts and fills.
- Shingle Springs to Placerville is ~ 8 miles of dirt trail, traversing on the rail bed at bridges, cuts and fills.
- At Oriental St, the paved trail begins, and the dirt trail parallels portions of the paved trail.
- The paved section of trail, including street connectors, is ~12.5 miles.
- A dirt section of trail continues for another ~.5 miles.
How long is each section of trail?
|
0